Project : GMR Energy 2x400MW CCP PROJECT
Site : Singapore
Client : IFS
End-user : GMR Energy(Singapore) Pte Ltd.
Delivery : Aug. 2012
Scope of Work : Shop/Field Fabrication Drawings
Procurement of piping and structural
steel works material
Fabrication of piping, structural work / SKID
assembly with E&I Interconnection
Final Vendor Documents
Main Material : Structure : ASTM A36
Piping : SS316, CS