◆ Description
Improve the airtightness of AL material by injection of impregnation solution into hole and then hardening it.
◆ Main Specification
MODEL | Lift & Carry Type | |
C/TIME | 66sec/EA | |
PROCESS | LOADING | Auto Loading Unit(P/Place) |
Transfer Type - 2Work & Pallet | ||
IMPREGNATION | Control chamber in vacuum state after putting work - Vacuum Pump 10Torr : 25sec |
|
Deeping work in impregnation solution : 5sec | ||
Stay atmosphere statement in impregnation chamber : 5sec | ||
Control temperature of impregnation solution under 25℃ : By Chiller |
||
SEGREGATION | By work reverse or centrifuge | |
WASHING | Remove the impregnation solution in tap hole in order to prevent chocking tap hole |
|
AIR BLOWING | Segregate washing solution | |
HARDENING | Put work in the chamber and harden the impregnation solution by steam or electric heater for 15 min. : Maintenance of temperature in 120℃ |
|
VACUUM PUMP | BUSCH R5-2500-7.5KW |
◆ Drawing