◆ Description
Improve the airtightness of AL material by injection of impregnation solution into hole and then hardening it.
◆ Main Specification
| MODEL | Lift & Carry Type | |
| C/TIME | 66sec/EA | |
| PROCESS | LOADING | Auto Loading Unit(P/Place) |
| Transfer Type - 2Work & Pallet | ||
| IMPREGNATION | Control chamber in vacuum state after putting work - Vacuum Pump 10Torr : 25sec |
|
| Deeping work in impregnation solution : 5sec | ||
| Stay atmosphere statement in impregnation chamber : 5sec | ||
| Control temperature of impregnation solution under 25℃ : By Chiller |
||
| SEGREGATION | By work reverse or centrifuge | |
| WASHING | Remove the impregnation solution in tap hole in order to prevent chocking tap hole |
|
| AIR BLOWING | Segregate washing solution | |
| HARDENING | Put work in the chamber and harden the impregnation solution by steam or electric heater for 15 min. : Maintenance of temperature in 120℃ |
|
| VACUUM PUMP | BUSCH R5-2500-7.5KW | |
◆ Drawing
