Airbank
- Utility model and design registered
- PCT patent apply in 80 countries
- Export to 46 countries
- Patent registered in US and EU
Benefits of TAEHA Airbank
Convenience and easy installation of air headers with fully fitted pulse valve and all accessories by CNC
processing. Anodizing surface treatment of aluminum pipe only prevents the rust and operational error
but also provide elegant appearance. No need cutting, welding, tapping which are time-consuming and
costly for manufacturing. Inserting valve into Airbank can generate high dedust efficiency and be cost
effectiveness by maximizing airflow and minimizing pressure loss. Airbank features easy replacement
of spare part and convenient installation by using aluminum airheader cover built in mounting bracket
with fully assembled pressure gauge, drain cock, main inlet valve. Round type header pipe meets US
and EU pressure container safety guideline.
1. Round header tank with screw type valve
Disadvantage of the screw type diaphragm valve
- Tedious and complicated work for cutting, welding, tapping
- Require rubber hose to correct error caused by thermal expansion during welding
- Operation error caused by particle and corrosion due to moisture inside header tanks
- Pressure loss between valve on air header tanks and blow tube
- Air leak by welding failure
2. Round header tank with coupling type valve
Disadvantage of the coupling type diaphragm valve
- Same problem with screw type diaphragm valve
- Completely make a screw when you install, otherwise unfixed valve can come out and cause the personal injury
3. Round header with flange type valve
Disadvantage of the flange type diaphragm valve
- Tedious and complicated work for cutting, welding, tapping
- Operational error by particle and corrosion due to moisture inside header tanks
- Air leak by welding failure
- Costly and time consuming for bolting
4. Square header tank with full immersion type valve
Disadvantage of square header tank
- Using the square type tank is difficult to meet EU and US pressure container safety guideline
- Operational error by particle and corrosion due to moisture inside header tanks
- Air leak by welding failure
- Stress concentration on 4 edges part of square tank can cause crack
Compressed air presents a source of considerable potential energy precautons must be taken to prevent accidents
1. Handle with care. Directly holding valve, outlet pipe and coil for conveyance may cause damage.
2. As to supply clean air into Airbank, you need to clean the air pipe between air compressor and main
inlet valve by passing the compressed for at leat 5 minutes.
Be sure to connect the end of pipe with main valve after removal of the particle by above method, when
you make installation. It is very critical process for valve reliability.
3. There is no particle in the Airbank during its production, but the particles can come from the pipes,
which may cause operational error. Therefore you should open the drain cock for at least 5 minutes
after piping.
4. Do not make over pressure when you connect outlet pipe with connector, it may cause air leakage due
to removal of rubber packing. Torque 4~5 kg would be suitable.
5. Do not make over pressure when you connect nipple, which may break the bonnet. Screw nipple with
torque 1~2 kg would be optimal, cut the hose by 90 accurately.
6. When you connect the header and header with screw, you should use sliding joint and make sure two
parts are in common center line.
7. Precautions must be taken when you replace outlet pipe with left screw. Do not disassemble for other
purpose except replacing.
8. Compressed air contents moisture, which can cause operational error, you should remove the moisture
inside of the header by open the drain cock regularly.
9. When you replace the spare part kit such as diaphragm etc. you should remove the compressed air
before operation to avoid personal injury.
10. Complete leakage test has been done before release from our factory, so no further test required. In
early stage of air filling, leakage may happen due to the misfit o-ring, but it will be naturally sealed after
certain time operation.